Mass excavation and cut-and-fill run on 3D GPS machine control, with the haul roads, compounds and protection measures that let a site open properly.
Move the Material Once
Earthworks is where groundworks programmes are won or lost. P&S model the cut-and-fill balance, then execute it with GPS-guided machines from our own fleet, so material is moved once and import and disposal volumes stay close to the tendered figure.
Service Highlights
Volumetric balancing before the first dig
Cut-and-fill modelled against the design so the site balances where it can, reducing import and muck-away together.
3D GPS machine guidance as standard
Excavators and dozers work to model rather than to pegs, which cuts setting-out time and rework on large-volume moves.
Enabling works run alongside earthworks
Haul roads, compounds, hoarding and temporary services are installed by the same team, so the site stays workable as bulk moves progress.
Ecology and tree protection programmed in
Protection measures and monitoring requirements are built into the sequence rather than bolted on after an inspection.
Service Overview
Our Earthworks & Enabling Expertise
Site preparation decides whether temporary and permanent works can proceed safely and efficiently. We cover the full scope, from mass excavation down to the welfare unit and the hoarding line.
Bulk Excavation & Cut and Fill
Mass excavation, cut-and-fill operations and disposal of arisings, executed to a modelled earthworks balance.
Haul Roads & Site Access
Temporary haul roads and access routes constructed and maintained to keep plant moving in all weathers.
Site Compounds & Temporary Services
Compounds, storage areas, welfare facilities and temporary site services established at mobilisation.
Hoarding & Site Security
Perimeter hoarding, fencing and security measures installed to protect the site and the public.
Tree Protection & Ecological Compliance
Tree protection fencing and ecological protection and monitoring measures delivered to the approved method statements.
Utility Disconnection & Diversion
Disconnection, diversion and installation of utility services ahead of the main works.
How We Run Bulk Earthworks
STEP 1
Design & Levels Review
Engineering drawings, topographical survey and geotechnical data reviewed to establish the achievable cut-and-fill balance.
STEP 2
Earthworks Strategy
Material classifications, haul routes and stockpile locations agreed, along with the plant mix to suit volumes and access.
STEP 3
Site Setup
Compound, welfare, hoarding, tree protection and temporary services installed before bulk works begin.
STEP 4
Haul Roads & Access
Temporary haul roads built to carry the anticipated plant movements for the duration of the earthworks.
STEP 5
Bulk Earthworks
Cut-and-fill executed on 3D GPS machine control, with volumes tracked against the model as the work proceeds.
STEP 6
Level Verification & Handover
Formation levels checked against the model and handed over ready for substructures or infrastructure works.