Civil Engineering

Civil Engineering & Reinforced Concrete Works

Substations, pumping station chambers, deep drainage and reinforced concrete structures, delivered inside the wider groundworks package.

Aerial view of a cleared development site with P&S plant carrying out bulk earthworks

The Heavy Civils, Without a Second Subcontractor

Every development carries structures that sit outside standard groundworks: retaining walls, tanks, chambers, substation bases. P&S build them with the same directly employed teams and owned plant, so the heavy civils do not arrive as a separate package with a separate programme.

Service Highlights

Reinforced concrete in house

Formwork, reinforcement fixing and pouring delivered by our own operatives, keeping concrete works inside the groundworks programme.

Deep excavation with owned plant

Large excavators and shoring from our own fleet, so depth and volume are a scheduling question rather than a hire question.

Structures tied into the earthworks model

Retaining walls, tanks and chambers are set out from the same 3D model as the bulk earthworks, so levels and falls reconcile first time.

Built to the specifying authority

Substations, pumping stations and attenuation are constructed to the network operator or water company specification, ready for inspection.

Service Overview

Our Civil Engineering Expertise

We execute the heavy civil works that sit between groundworks and structures, from below-ground storage and deep drainage through to reinforced concrete retaining structures and service buildings.
Reinforced Concrete Structures

Bases, slabs, plinths and structural elements built with fixed reinforcement and formwork to the engineer design.

Concrete Retaining Walls

Reinforced retaining structures constructed to design, including drainage, waterproofing and backfill to specification.

Deep Drainage Installations

Deep storm and foul runs installed with appropriate shoring and support, including connections into existing networks.

Attenuation Tanks & SuDS

Below-ground attenuation, storage crates and sustainable drainage features installed as part of the surface water strategy.

Pumping Station Chambers

Wet wells, valve chambers and associated civils constructed to water company requirements for foul and surface water pumping.

Substation Bases & Enclosures

Substation bases, ducting, enclosures and access provisions built to distribution network operator specification.

How We Deliver Heavy Civils

STEP 1
Structural Design Review
Engineer drawings, reinforcement schedules and specifications reviewed against site levels, access and ground conditions.
STEP 2
Temporary Works & Method
Excavation support, shoring and lifting methods agreed and designed before any deep work begins.
STEP 3
Excavation & Formation
Excavation to formation level with support installed as the dig progresses, and bearing strata confirmed before construction.
STEP 4
Reinforcement & Formwork
Reinforcement fixed and formwork erected to the schedule, with inspections held at the agreed hold points.
STEP 5
Concrete Pours
Pours sequenced and executed with the finish, tolerance and curing regime the specification requires.
STEP 6
Testing & Handover
Structures tested and inspected, with records issued for adoption, connection or structural sign-off as appropriate.

Our Other Services

Pre-Construction Advisory & Surveys

Programme, budget and ground investigation advice before site mobilisation.

Site Clearance, Demolition & Remediation

Controlled demolition, soil remediation and compliant removal of contaminated material.

Bulk Earthworks & Enabling Works

Cut-and-fill on 3D GPS machine control, haul roads, compounds and site setup.

Groundworks & Substructures

Foundation excavation, ground beams and blockwork up to damp-proof course level.

Infrastructure & Adoptable Works

Section 104 drainage, pumping stations and Section 38/278 highway works.