Greenfield and brownfield sites cleared, stabilised and made ready to build on, with contaminated material removed under permit.
Clear the Site Once, Properly
Remediation problems surface later as programme delays and unbudgeted disposal costs. P&S clear, demolish and remediate using owned plant and directly employed operatives, so classification decisions and disposal routes are settled on site rather than escalated.
Service Highlights
Owned plant means rapid mobilisation
Clearance gangs and machines are ours to schedule, so a site can be opened without waiting on hire availability.
Contaminated material handled under permit
Arisings are classified, documented and taken to permitted facilities, with duty of care records retained for your files.
Stabilisation instead of export where possible
Lime and cement stabilisation can turn unsuitable material into engineering fill, cutting disposal and import volumes together.
3D machine control on re-levelling
Remediation and re-profiling are executed to model, so finished levels tie straight into the earthworks design without rework.
Service Overview
Our Site Clearance & Remediation Expertise
We take sites in whatever condition they arrive in: standing structures, buried obstructions, made ground or contamination, and hand over a platform the substructure package can start on.
Site Clearance
Vegetation, hard standing and surface obstructions removed, with arisings segregated at source for reuse, recycling or disposal.
Demolition of Existing Structures
Controlled demolition of buildings, hard landscaping and surfaces, including below-ground obstructions and redundant foundations.
Soil Remediation
Treatment of contaminated ground in line with the agreed remediation strategy, with validation records for discharge of planning conditions.
Ground Stabilisation
Lime and cement stabilisation to improve bearing capacity and convert unsuitable arisings into usable engineering fill.
Contaminated Material Disposal
Classification, documentation and removal of contaminated soils and substances to permitted facilities.
Site Re-Levelling
Re-profiling to design levels using 3D GPS machine control, tying clearance works directly into the earthworks model.
How We Clear and Remediate a Site
STEP 1
Site Walkover & Desk Study
Reviewing the remediation strategy, site investigation data and any planning conditions attached to ground works.
STEP 2
Method Statements & Permits
Agreeing demolition methods, confirming asbestos survey findings where applicable, and fixing disposal routes before mobilisation.
STEP 3
Mobilisation
Compound, welfare, hoarding and site protection established, with plant delivered from our own fleet.
STEP 4
Demolition & Clearance
Structures, surfaces and obstructions removed, with material segregated at source for reuse, recycling or disposal.
STEP 5
Remediation & Stabilisation
Treatment, stabilisation or removal of unsuitable and contaminated material, with records maintained throughout.
STEP 6
Validation & Handover
Levels checked against the model and validation evidence issued, ready for the earthworks or substructure package to start.