Programme, budget and ground investigation advice before you mobilise, from the contractor who will be doing the digging.
Get the Groundworks Right Before Anyone Mobilises
Most groundworks overruns are set in motion before a machine arrives on site. P&S give commercial and technical input at design stage so the earthworks balance, the muck-away budget and the programme are tested against how the site will actually be dug.
Service Highlights
Programmes built by the people delivering them
Sequencing advice comes from operatives and plant we control, so the durations we give you are ones we can hold at tender stage.
Earthworks balanced before the budget is fixed
Cut-and-fill modelling at design stage cuts import and disposal volumes, which is usually the largest single variable in a groundworks package.
Ground investigations read commercially
We review geotechnical and contamination reports for what they mean for plant selection, muck-away classification and foundation depth.
Statutory coordination started early
Utility providers and archaeological requirements are engaged in advance, so approvals are not sitting on the critical path at mobilisation.
Service Overview
Our Pre-Construction Expertise
Whether it is a phone call, a meeting or a formal appointment, we share what we know before commitments are made. The areas below are where our input changes the commercial outcome most.
Programme Preparation & Advice
Realistic durations and sequencing for site clearance, earthworks, substructures and adoptable infrastructure, built around plant availability rather than optimism.
Budget Preparation & Advice
Early cost guidance on groundworks packages so the developer budget reflects ground conditions, disposal classifications and access constraints.
Ground Investigations & Reports
Commissioning or reviewing site investigations, then translating the findings into buildable methods and priced allowances.
Site Surveys
Topographical and measured surveys to inform levels, drainage falls and volumetric calculations before design is fixed.
Utility Coordination
Managing communication and attendance with utility companies on disconnections, diversions and new service installations.
Archaeological Liaison
Coordinating and attending archaeological requirements so watching briefs and trial trenching are programmed, not discovered.
How a Pre-Construction Engagement Works
STEP 1
Initial Enquiry
A conversation about the scheme, the programme you are working to and where the commercial risk sits.
STEP 2
Drawing & Site Data Review
We review engineering drawings, levels and constraints, and tell you what is missing before it costs money.
STEP 3
Ground Investigation Review
Geotechnical and contamination findings assessed for plant selection, disposal classification and foundation design.
STEP 4
Earthworks & Budget Modelling
Cut-and-fill volumes modelled to balance the site where possible and reduce import and muck-away allowances.
STEP 5
Programme & Sequencing
A buildable sequence for clearance, earthworks, substructures and adoptable works, with realistic durations.
STEP 6
Tender Issue
A fully costed fixed-price package, with assumptions and exclusions stated plainly rather than buried.